Another HPRE-MD project is in the books—this time at an MBTA maintenance facility in Boston.

Built for performance, HPRE-MD helps reduce noise and vibration, provides reliable electrical isolation, and delivers the toughness and chemical resistance needed for demanding transit rail environments.

Proud to partner with Railroad Construction Company (RRC) on another successful project. Watch how FastPatch® HPRE-MD was installed in this project: